University of Harbin Engineering
My work on this project was divided into two periods: Bid and Conceptual Preliminary Designs. During the Submission of Tender period, assist the architect to finish the design of some construction monomer and make the report about it, also complete the architecture effect chart for tender. In the Conceptual Preliminary Design period, participate in the construction drawing of the science innovation center and the dormitory building for students. 
Yongkang Hardware Technician College